You are here :   Home » FAQ
 
 
FAQ
Unfold Close  ICF forms

The points at which utilities connect to the building should be identified prior to the pour. This will allow for conduits to be placed through the wall so that the utility can enter. Once the concrete is poured and cured, channels or grooves are cut directly into the form using and electric hot knife or router. Plumbing and electrical lines are then inserted into the grooves and covered by drywall.

Trimtec Systems • Trimtec Engineered Packaging  E-mail: tts@trimtecsystems.com

Corporate Office:

2455 Harrisburg Pike., Grove City, Ohio 43123 • 

Phone 614-820-0340 • Fax 614-820-0341 •

©2016-2012 Trimtec Systems, LTD

Designed by  MDF Graphics

  Privacy | Terms Of Service | Site Map